RFPs



Link to RFP 
Request for Proposals for the Glendale Freeway Ramps/Space 134 "Vision Plan"


Mandatory Pre-Proposal Meeting

Thursday, April 28, 2016, 10:00 am – 12:00 pm
City of Glendale
Municipal Services Building
633 E. Broadway, Room 105
Glendale, CA 91206

Description of Project


The City of Glendale is seeking to obtain the services of a well-qualified firm or team of firms, specializing in environmental planning, traffic analysis, civil/structural engineering, and urban design, to study and develop the road and transportation network surrounding Space 134 as it passes through downtown Glendale. Focusing on roadway design and traffic analysis, this project will study the complex relationship between the Space 134 Cap Park; the 134 Freeway; the city's street, bicycle, pedestrian, and bus network; and a number of Bus Rapid Transit (BRT) route alternatives currently being studied by the Los Angeles County Metropolitan Transit Authority (Metro).

The end product will be a final report that describes and illustrates a preferred transportation network, including freeway lanes, freeway on- and off-ramps, the City’s surrounding surface streets, and Metro’s proposed BRT facilities; summarizes the impacts of the preferred transportation network on traffic; proposes a conceptual construction schedule and describes potential construction staging considerations and scenarios; and provides an engineering cost estimate. The final alternative generated as a part of this Phase 3 work will be the project description for a Program EIR to be conducted in a future Phase 4.

Key Dates


Event
Date
Request for Proposals (RFP) Issued
March 28, 2016
Mandatory Pre-Proposal Meeting
April 28, 2016, 10:00 am – 12:00 pm
Deadline for Written Questions and Requests
May 11, 2016, 5:00 pm 
Responses and Addenda Issued
May 20, 2016
Technical and Price Proposals Due
June 3, 2016, 5:00 pm
Interview Firms (TBD based on City review of written proposal)
Late June – Early July 2016
Proposed Approval of Selected Consultant(s) by City Council
Mid  – Late July 2016
Notice to Proceed / Service Contract Begins / Kick-Off Meeting
Late August – Late September 2016
Project Completion Date (18-20 mos. after start of contract)
Fall 2017